Optima Engineering PA
Optima Engineering, P.A.
1927 South Tryon Street STE 300
Charlotte, NC 28203
Phone: 704-338-1292
Email info@optimapa.com
Net Zero Energy Buildings

Optima Engineering is striving to comply with the 2030 challenge with all of its designs. It is an ambitious goal and we are the first to admit that we have a long way to go.

The 2030 Challenge is challenging us, the design community, to design energy efficient buildings to meet the following criteria:  all new building, developments and major renovations shall be designed to meet a fossil fuel, GHG-emitting, energy consumption performance standard of 50% of the regional (or county) average of that building type.

The fossil fuel reduction standard for all new building shall be increased to:

  • 60% in 2010
  • 70% in 2015
  • 80% in 2020
  • 90% in 2025
  • Carbon-neutral in 2030

The ultimate goal is the Net Zero Building or a building that produces the same amount of energy in a year that the building consumes.

Net Zero Project List:

  • Western Elementary School
     

 

Website Developed By ... - click for more info
close
Charlotte Web Design, Digital Trooper
Charlotte Website Design
Charlotte Web Design Morphogine CMS